1.3.1 (build 30)
The first update since April.
New
- Attraction pages show a DESCRIPTION panel above the statistics when the catalogue has one.
- Measure Ops starts with the number of trains and riders per train from the catalogue, with a note "Based on Cred Count data, adjust for current operations".
Changed
- If the catalogue has no train figures for an attraction, the Measure Ops fields start empty and you fill in both before continuing. Before, every attraction started from an invented 2 trains and 24 riders.
- Imported rides that were never matched are checked against saved name aliases after each catalogue sync, so more of them link up on their own.
- Suggest a park, Suggest an attraction, Suggest an edit and Report an issue all send in the same way.
- A park suggestion with a web address in its comments passes that address on as the source.
Fixed
- The 350th Cred and 450th Cred trophies could never unlock. They can now.
- Suggesting an edit or a new attraction was pointing at the wrong place in the catalogue.
Revisions
An entry is never rewritten. A correction is published beside the revision it corrects, and every earlier revision is kept as it was published.
| Revision | Published | Copies | What changed |
|---|---|---|---|
| Revision 1 | 12 October 2026 | this page | — |