---
app_version: 1.3.1
build: 30
released: 2026-07-04
stores: [play]
stage: internal
summary: Attraction pages show descriptions, Measure Ops starts from the catalogue's train figures, and the 350th and 450th Cred trophies can finally be earned.
revision: 1
written_up: 2026-10-12
---

# 1.3.1 (build 30)

The first update since April.

## New
- Attraction pages show a DESCRIPTION panel above the statistics when the catalogue has one.
- Measure Ops starts with the number of trains and riders per train from the catalogue, with a note "Based on Cred Count data, adjust for current operations".

## Changed
- If the catalogue has no train figures for an attraction, the Measure Ops fields start empty and you fill in both before continuing. Before, every attraction started from an invented 2 trains and 24 riders.
- Imported rides that were never matched are checked against saved name aliases after each catalogue sync, so more of them link up on their own.
- Suggest a park, Suggest an attraction, Suggest an edit and Report an issue all send in the same way.
- A park suggestion with a web address in its comments passes that address on as the source.

## Fixed
- The 350th Cred and 450th Cred trophies could never unlock. They can now.
- Suggesting an edit or a new attraction was pointing at the wrong place in the catalogue.

# SHORT

Attraction pages show a description panel when the catalogue has one. Measure Ops now starts from the catalogue's trains and riders per train instead of invented figures, and asks you to fill them in if the catalogue has none. Imported rides that were never matched link up more often through saved aliases. The 350th and 450th Cred trophies can now be earned, and suggesting an edit or a new attraction goes to the right place.
